Photo accountability

End the “was it done?” argument with photo proof on every job.

You choose which tasks need a photo before they can be marked done, from a route stop to a plaster phase. Every photo carries who took it, when and where.

  • Four levels per task: off, optional, wanted, or required
  • A required photo blocks the task from being completed without it
  • Required photos are taken in the app, not picked from the camera roll
  • Date, time and location on every photo
  • Who took it, on every photo
  • The same rule on route stops and on project phases

Definition of done becomes a setting

Every owner has had the conversation about what “done” means, more than once, with the same person. In PoolPath it is a setting on the task. If the after photo is required, the stop does not close without it.

It protects your tech more than it polices them

When a customer says nobody came, the photo with its time and place is what proves your tech was there. The good ones already want that cover.

Frequently asked questions

Can I require a photo before a task is marked done?
Yes. Each task has four levels: off, optional, wanted or required. A required photo blocks the task from being completed without it.
Can a tech pick an old photo from the camera roll?
Not for a required photo. Required photos are taken in the app.
What does each photo record?
Who took it, the date, the time and the location.
Does it work on construction jobs as well as routes?
Yes. The same rule applies on route stops and on project phases.